A twin generator or two separate sets?
A comparison of the two approaches in terms of space, cost and operation for projects that need redundancy.
Both approaches serve the same purpose: keeping power on when one unit stops. The difference shows in layout and operation.
In a twin, two units share one chassis and one canopy; the synchronisation panel is installed and tested at the factory. On site it needs one foundation, one fuel connection and a shorter commissioning time.
Two separate sets can be placed at different points, and even if one is completely out of service the other is physically unaffected. Preferred by facilities with ample space that want to separate fire zones.






